Phase 2 Hardware in IC

Pictures taken in the 2k cleanroom and the Instrument Chamber between Phase 2 Part 2 and Phase 2 Part 3, over April 15th and 16th. The HRC has come out of the chamber, the HRMA & OTGs are staying in, and the ACIS is being installed.

Click on the inline images to obtain the larger images.

Updated 4/16/97


images/9704/9704i.jpeg

The ACIS, on the bed of its shipping container, about to go onto the LASS-Z. Sharp-eyed vets can spot the HXDS and ACIS-2C in the background.

images/9704/9704b.jpeg

The ACIS moving onto the horizontal LASS-Z.

images/9704/9704c.jpeg

The FAM, prior to ACIS installation. TOGA shutter, aka doggie door, aka Auxiliary Shutter System, is visible on MDS pylon. TOGA shutter will not be present for ACIS testing.

images/9704/9704e.jpeg

The HRMA. All shutters closed. Shutter offloaders visible.

images/9704/9704f.jpeg

The HRMA. All shutters closed. Shutter offloaders visible.

images/9704/9704g.jpeg

The HRMA. All shutters closed. Shutter offloaders visible.

images/9704/9704h.jpeg

The HRC in the 2k cleanroom after removal from the chamber.

images/9704/9704j.jpeg

The ACIS, PSMC, and RCTU on the LASS-Z, on the SIM cart, after rotation to vertical.

images/9704/9704k.jpeg

The +X side of the LASS-Z, with the ACIS on the -X side, prior to FAM integration.

images/9704/9704l.jpeg

The XRCF version of the ISIM (LASS_Z with ACIS, RCTU, and PSMC) moving toward the FAM.

images/9704/9704n.jpeg

ACIS, PSMC, and RCTU on LASS-Z. The LASS-Z is positioned low, with the ACIS below its viewing postion. RCTU and PSMC are at top of LASS-Z, RCTU under blanket on left side.

images/9704/9704o.jpeg

The blanketed ACIS on the Lass-Z on the FAM. The ACIS has two additional heater panels added to its -Z ACIS, +Z XRCF side.

images/9704/9704p.jpeg

The blanketed ACIS on the LASS-Z, on the FAM, prior to Cold Shroud installation.

images/9704/9704q.jpeg

The FAM, with the ACIS in position. ISIM & ACIS HST cables going on. Picture seems to be tilted to left due to FAM theta-Z checkout.

images/9704/9704r.jpeg

The Aft HRMA structure. The shutters (sporting their spiffy new offloaders) are all closed; the LETG is partially visible. The HETG is in position. The Aft (and foreward) contamination cover is closed.

images/9704/9704s.jpeg

The FAM, with the ACIS in position. ISIM & ACIS HST cables going on.

images/9704/9704u.jpeg

The Aft HRMA structure. The shutters (sporting their spiffy new offloaders) are all closed; the LETG is partially visible through the central aperture. The HETG is in position. The Aft (and foreward) contamination cover is closed.

images/9704/9704v.jpeg

The Cold Shroud Assembly covering the ACIS on the FAM in the Chamber, behind the HRMA.

All pictures on this page taken with the Kodak DC20 Digital Camera. An inexpensive, 24-bit, pocket-sized digital camera.
Back to the main picture page.