ACIS Installation Pictures taken 4/15 and 4/16 of ACIS integration, HRMA in IC, HRC in 2k Cleanroom.
HRMA in Instrument Chamber Pictures taken 12/18/96 of HRMA, Gratings, and HXDS just prior to start of Phase 1 Calibration.
HETG Installation Pictures taken 12/10/96.
LETG Installation Pictures taken 12/9/96.
HRMA Structures Pictures taken 12/6/96. HRMA foreward and aft structure installation.
HRMA on Rails Pictures taken 12/4/96. HRMA up on Source-End Test Bench. on a C5.
HRMA at XRCF Pictures taken 12/1//96. HRMA in Shipping Container arriving at XRCF unloading dock.
HRMA Arrival at RSA Airport! Pictures taken 11/30/96. HRMA in Shipping Container arriving on a C5.
HRMA Dry Run Pictures taken 9/11/96. HRMA Simulator in Shipping Container arriving on a C5.
XRCF Pictures 8/7/96 Pictures of hardware taken on 8/7/96, including the configuration for Phase 1 rehearsal (TMA / TOGA / HXDS)and the FAM and CSA in the 10k cleanroom.
XRCF Pictures General pictures of the facility.
HRMA Simulator and XRCF FSE Pictures Pictures taken at EKC 7/11/96. HRMA simulator in the XRCF support system, with details of shutters and GRIMs.
FAM Pictures Two pictures of the FAM weldment, just after its manufacture.
External Fluid Ports Instrument Chamber Ports AA and D.
Internal Patch Panels The internal panels for Ports AA and D.
Bench-Top Hole Patterns Images we took for final design of the Batwings. Pictures include benches, rails, walkways, etc., inside the IC.
Miscellaneous XRCF Pictures Wide area shots, rails, doors, cranes, heaters, etc.
HRMA Shipping Container being load tested in sunny San Pedro, California.