CMDB Summary Sheets
Summaries of each phase's CMDB. Note CMDB revision dates and summary calculation dates.
Click on the inline images to obtain the larger images.
Updated 11/15/96
These summary sheets can get pretty arcane. I'm happy to discuss the calculations behind them, and the possibility of calculating any other statistics you may need.

(gif 50K)
Phase 1 rehearsal. CMDB dated 8/15/96, summary calculated 8/17/96. As-run CMDB was revised many times from the version summarized here.

(jpeg 264K)
Phase 2 rehearsal. CMDB dated 9/25/96, summary calculated 9/25/96.

(jpeg 264K)
HXDS Re-Verification. CMDB dated 10/16/96, summary calculated 10/17/96.

(jpeg 264K)
Phase 1, subphases A & B. CMDB dated 11/8/96, summary calculated 11/15/96. CMDB consists only of HXDS team submissions, no grating submissions yet. New features include: Measurement time calculated from integration time and measurement-type efficiencies measured in HXDS re-Verification phase. These efficiencies were measured by dividing actual integration time by total run time of each measurement. Total Time on this sheet is somewhat additionally padded by adding configuration overhead to Measurement Time, but I feel comfortable in doing this, because the HRMA is a new system, and it's configuration time was not part of the measured efficiency.

(gif 50K)
Phase 1, subphase C. CMDB dated 4/1/96, summary calculated 8/17/96.

(gif 50K)
Phase 1C. CMDB dated 4/1/96, summary calculated 8/17/96.