Table 7: HRMA/HRC-I

Test Name, Description and Accuracy Requirement ( 1 )

Justification

Off-axis angles

T, °C

Energy Sampling Interval (E)

Estimated Integration Time

Detector

5.
5.1 Knife-Edge Focus

Locate focal position along optical axis such that image shift in knife-edge test is < 0.1" . 5 positions along x-axis. hsiimage with 4 shutter settings at each focal setting. Unresolved issue: how will we coordinate between the XDACS and the HRC to control the acquisition of data and the control of the shutters? What GSE will be used to make the SIM motions?

maximize sensitivity for point source detection, for example, knots in jetsc.

on-axis

Temp1, nominal

4 energies: Cu K, Al K, TI K, Cu K (see Table 15 ).

5.1.1

HRC(5 x positions, 4 shutters, 1 angle, 1 T, 4 E) = [(268+4 x 100) x 5 +(4.5+1.6 x 0.1) x 4] x 4+900 x 3= 4.5 hr

HRC-I, BND(FPCs, SSS), FMS

5.2 Focus by Changes in PSF Core

Use image acquisition capability of HRC.
Overhead times are unknown!!
Accuracy: to 0.025 mm (TBR) vs. temperature for 3 temperatures.

maximize point source sensitivity

on-axis

Temp1, nominal

4 energies: Cu K, Al K, TI K, Cu K (see Table 15 ).

5.2.1

[(50 x 5+(4.5+1.6 x 0.1) x 4] x 4+900 x 3= 1.0 hr

HRC-I, BND(FPCs, SSS), FMS

5.3 Effective Area Confirmation

Effective area at one image radius

Accuracy to 1%. The HRC must be translated & rotated so the images striking it duplicate the conditions in flight. The SIM rotates and translates to keep the HRC detectors in a rigid body relationship with the HRMA. XGA turned down to 10-4 of max.

source fluxes and spectra

on-axis

Temp1, nominal

25 energies (see Table 15).

5.3.1

4000 x 25 = 27.8 hr

HRC-I, BND(FPCs, SSS), FMS

Set1 (6).

6 energies: TBD based on an examination of the predicted curve of effective area of combined HRMA and HRC-I vs. energy, to select critical energies at features in the curve.

5.3.2

4000 x 6 x 6 = 40 hr






Subtotal: 6.5 hr


5.4 On-axis HRMA/HRC-I PSF & PSF-Wing Calibration

1% of the measured value in 1 x 1 arc sec cells within 2 arcsec of image center, 3% of the measured value in 1 x 1 arc sec cells from 2-20 arcsec.

Source structure and detection of extended emission around point sources. (strongest source: 0.01 Crab)

on-axis

Temp1, nominal

10 energies:B K, C K, Cr L, Cu L, Al K, Ag L, Ti K, Cr K, Fe K, Ge K

5.4.1

(10000+
1500)+x10 = 1.3 days

HRC, BND(FPCs, SSS), FMS

Set1 (6)

4 energies: C K, Al K, Ti K, Fe K

5.4.2

11500x6x4 =3.2 days






Subtotal: 110 hr


5.5 HRMA/HRC-I Plate Scale and Related Properties

Relative image positions to 1 arcsec on scales of 5 arcmin to 1 arcsec (?).
Assumes that HRC and XDA are co-mounted to speed up temperature change measurements.

Identification of sources in deep surveys, source positions.

50 (TBD)

Temp1, nominal

4 energies: C K, Al K, Ti K, Fe K

5.5.1

{[HRC(100sec)x n q + 600 x (n q - 1)] x n E + 900 x (n E - 1)} = 100 x 50+600 x 49 x 4+900 x 3

= 34.8 hr

HRC, BND(FPCs, SSS), FMS

10 (TBD)

3 Ts

Al K

5.5.2

[100x10+600x9x1+900x0]x3=5.3 hr






Subtotal: 40.1 hr


5.6 HRMA/HRC-I Count Rate Linearity

1% for source flux rates of 5, 10, 15, 100 and 200 s-1.

Identification of sources in deep surveys, source positions.

near axis

Temp1, nominal

7 energies: ??

5.6.1

4000x7 = 7.5 hr

HRC, BND(FPCs, SSS), FMS

5.7 X-ray ghost images, outer

Imaging detector used for quick survey, 0.1 mm resolution, out to 100 mm diameter.

avoid aliasing

field of HRC

Temp1

2 energies: Be K, Fe K

5.7.1

18.9 hr

HRC, BND(FPCs, SSS), FMS

5.8 Background Data for Interpreting XRCF Calibrations

10% accuracy.

Needed for HRMA/HRC data analysis.

N.A.

Temp1, Temp2,a Temp3a

N.A.

5.8.1

15 hr

HRC, BND(FPCs, SSS), FMS

5.9 Total Integration Time for HRMA/HRC

8.5 days


:

s


b.Faint source detection & identification, e.g. deep surveys, nearby galaxzies, globular cluster source masses. (HRC proposal).

d.Wilson response to MSFC Project Scientist inquiry, May 24. 1991.

g. ACIS response to MSFC Project Scientist inquiry, Apr 30, 1991.

g. ACIS response to MSFC Project Scientist inquiry, Apr 30, 1991.

h. XRS response to MSFC Project Scientist inquiry, May 22, 1991.




Back to Introduction