|
Data AcquisitionTime Estimatea |
||
|---|---|---|
|
|
a. Includes any overhead: computer setup, motor motion, source change, instrument temperature change. We have assumed that the times required for collecting data by the HRC and the ACIS and the times to move the SIM are the same as for the comparable HXDS instruments.